Electrical Engineering & Installation Intelligence API
Run deterministic load schedules, phase balance, voltage drop, cable sizing, breaker checks, transformer capacity, power-factor correction, generator sizing, EV charger capacity, and design-document audits from caller-supplied parameters—without inventing electrical standards.
Calculate kW, kVA, and current for caller-supplied loads using supplied voltage and power factor. Missing values are not invented.
Compare phase-leg currents from supplied loads and report imbalance percentage. Optional caller rule thresholds are compared when provided.
Calculate voltage drop from supplied cable resistance/reactance, length, and load current. Cable tables are not invented.
Compare calculated design current to caller-supplied cable ampacity. Ampacity tables are not invented.
Compare calculated design current to caller-supplied breaker ratings and continuous factors. Code rules are not invented.
Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage.
Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target.
Size required generator kVA from supplied load and caller diversity, reserve, and derate factors.
Check EV charger design current against caller-supplied panel capacity and existing load. Continuous factors are used only when supplied.
Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks. Does not invent code compliance.