Electrical Engineering & Installation Intelligence API

Electrical EngineeringInstallationPower Systemsx402

Run deterministic load schedules, phase balance, voltage drop, cable sizing, breaker checks, transformer capacity, power-factor correction, generator sizing, EV charger capacity, and design-document audits from caller-supplied parameters—without inventing electrical standards.

POST/api/v1/electrical-engineering/load-schedule-calculate$0.04 USDC

Calculate kW, kVA, and current for caller-supplied loads using supplied voltage and power factor. Missing values are not invented.

POST/api/v1/electrical-engineering/three-phase-load-balance-check$0.03 USDC

Compare phase-leg currents from supplied loads and report imbalance percentage. Optional caller rule thresholds are compared when provided.

POST/api/v1/electrical-engineering/voltage-drop-calculate$0.04 USDC

Calculate voltage drop from supplied cable resistance/reactance, length, and load current. Cable tables are not invented.

POST/api/v1/electrical-engineering/cable-sizing-calculate$0.04 USDC

Compare calculated design current to caller-supplied cable ampacity. Ampacity tables are not invented.

POST/api/v1/electrical-engineering/breaker-rating-check$0.03 USDC

Compare calculated design current to caller-supplied breaker ratings and continuous factors. Code rules are not invented.

POST/api/v1/electrical-engineering/transformer-capacity-calculate$0.04 USDC

Compare transformer rated kVA to supplied or schedule load kVA and report loading percentage.

POST/api/v1/electrical-engineering/power-factor-correction-calculate$0.03 USDC

Calculate required kVAR (and optional capacitance) to move from a supplied power factor to a supplied target.

POST/api/v1/electrical-engineering/generator-sizing-calculate$0.04 USDC

Size required generator kVA from supplied load and caller diversity, reserve, and derate factors.

POST/api/v1/electrical-engineering/ev-charger-load-capacity-check$0.04 USDC

Check EV charger design current against caller-supplied panel capacity and existing load. Continuous factors are used only when supplied.

POST/api/v1/electrical-engineering/design-document-audit$0.08 USDC

Audit completeness of supplied electrical design inputs and aggregate load, balance, drop, cable, breaker, transformer, PF, generator, and EV checks. Does not invent code compliance.